Skills Gap Calculator
Compares a participant's current job to a target job using O*NET skill ratings, then estimates the OJT training hours needed to close the gap.
Data: O*NET 31.0 · Method: importance-weighted, floored · Hours basis: Job Zone midpoint
Adjust hours basis
Knowledge gap
weighted deficit
Skills gap
weighted deficit
Combined gap
blended
Recommended OJT
training hours
How the gap is calculated
For each competency the tool reads two O*NET numbers on the target occupation: the Level the job requires and how Important that competency is. It reads the source occupation's Level for the same competency.
- Per-item deficit, floored at zero.
deficit = max(0, TargetLevel − SourceLevel). A surplus on one item never cancels a shortfall on another. - Importance weighting. Each deficit is multiplied by the item's importance to the job.
- Domain gap %.
Σ(deficit × importance) ÷ Σ(TargetLevel × importance). - Blend. Knowledge and Skills weigh equally; adding Abilities makes it a third each.
- Hours.
Combined gap % × training basis. See "How training hours are set" below.
The O*NET data is stored on this website and refreshed automatically when O*NET publishes a new database release. Nothing you type is sent to O*NET. Levels and importance are shown as O*NET standardized scores (0–100).
How training hours are set
The hours figure starts from a training basis — an estimate of the full time it would take to prepare someone with no relevant background for the target job — which the gap percentage then scales down.
- Job Zone. Reflects how much preparation the target occupation needs (2–5). Read automatically from the target.
- SVP range → midpoint. Each zone maps to a range of Specific Vocational Preparation (SVP) time; the tool uses the midpoint as the basis, and shows the full range for context: Zone 2 ≈ 1,300 hrs (520–2,080), Zone 3 ≈ 3,120 hrs (2,080–4,160), Zone 4 ≈ 6,240 hrs (4,160–8,320), Zone 5 ≈ 14,560 hrs (8,320–20,800).
- Scale by the gap. Recommended hours = combined gap % × the midpoint basis.
- Optional cap. Off by default. Turn it on if your board limits OJT length (e.g. six months). Treat the result as a starting estimate — adjust for the trainee's prior experience and finalize in the Training Plan.
An important limitation. SVP measures the total preparation to reach competence — schooling, prior experience, and on-the-job training combined — which for professional occupations runs to years. That is why the midpoint figures are large. The basis, midpoint, and cap are all adjustable under "Adjust hours basis," so this can be replaced with a board-specific hours schedule if one exists.